School Complex Furadouro

ALCorreia, Lda concluded in September 2010 the installation of the School Complex Furadouro in Amoreira. This project was developed within the project “Parque Escolar“.
This work comprehended the Electrical Installation with Transformation post, TIB installation, Intrusion Detection System (IDS), Fire Detection System (FDS), Time and Sound Broadcasting.

This installation location has been developed in an area 7.000m2.

This work was sponsored by the Município de Óbidos.

Eliana Correia
Eliana Correia
Design Comunicação na ESTAL Técnicas e Gestão Hoteleiras na EHTL Pós Graduação Gestão Empresarial ISLA